Check vault decorated, beginning of the twentieth century, during the works on the ground floor of Palazzo d’Accursio.
Behind a false ceiling, vault it has been decorated in grotesque, in good condition.
Now it will be clean and stuccoed in the cracks of greater magnitude, and the major gaps will be covered with a pictorial drawing that connects harmoniously to the rest of the painting, explains a note from the Municipality.
The construction site concerns the “metropolitan open laboratory for imagination, collaboration and civic innovation” will be a cultural center, in the heart of the city, which will connect the different containers of via Rizzoli, piazza Re Enzo and via Ugo Bassi: the Modern cinema, the ‘former Galleria d’Accursio (Rizzoli underpass), Palazzo Re Enzo, Sala Borsa, Palazzo d’Accursio.
The works are concentrated in the underpass of Via Rizzoli, in the rooms on the ground floor of Palazzo d’Accursio and part of Salaborsa, “just to allow a part of the most impacting site will be closed from Monday 30 July to Wednesday 15 August inclusive”, as confirmed by the library site, which warns: “For the rest of the summer, regular time”.
In this period, explains the Municipality, “works on the second floor are very noisy and dusty, therefore incompatible with the opening to the public, in particular the demolition of the floors of the former kitchens and the installations on the roof. in Sala Biagi they will start instead in January 2019 “.